PROJECTS
BI-MART WAREHOUSE
This 205k sf warehouse addition was completed in 2018 and more than doubled the existing storage and added 35 loading docks. It features tilt-up concrete walls and a panelized metal roof system.
PROJECTS
This 205k sf warehouse addition was completed in 2018 and more than doubled the existing storage and added 35 loading docks. It features tilt-up concrete walls and a panelized metal roof system.